Understanding Construction Change Orders: What They Are, How They Work, and Why They Matter

A Guide for Homeowners Planning a Custom Home or Renovation
When building a custom home or undertaking a major renovation, one of the most important aspects of a successful project is clear communication about the scope of work, budget, and schedule.
Even with detailed plans, carefully selected materials, and thorough preconstruction planning, changes can arise during construction. Some are requested by the homeowner, while others result from existing conditions, design modifications, or requirements that were not anticipated when the original agreement was executed.
This is where a construction change order comes into play.
At Stepbrothers Contracting Group, we believe homeowners should understand how change orders work, when they are necessary, and how they may affect their project.

What Is a Construction Change Order?
A change order is a written modification to the original construction agreement that documents an approved change to the project's scope of work, contract price, schedule, or other applicable contractual requirements.
Your construction contract establishes the work we have agreed to perform, the materials and finishes included, and the associated costs.
When something changes from those original requirements, a change order provides a formal way to document the adjustment so everyone understands exactly what is being added, removed, or modified.
Importantly, not every question, clarification, or field adjustment requires a change order. A change order becomes necessary when the proposed modification changes the contractual scope, price, schedule, or another agreed-upon requirement.
What Typically Constitutes a Change Order?
Change orders can arise for several reasons.
1. Homeowner-Requested Changes
These are among the most common change orders.
For example, a homeowner may decide to:
Upgrade countertops or flooring after the original selections have been approved.
Add recessed lighting, electrical outlets, or specialty fixtures.
Modify cabinetry configurations or introduce additional storage features.
Change plumbing fixtures or relocate a sink.
Add architectural details or expand an area of the original scope.
Even relatively small modifications can affect multiple trades, materials, and installation schedules.
2. Changes to Plans or Design
Architectural or engineering revisions made after the contract is executed may require changes to the original scope.
For example, relocating a wall, changing a window size, modifying a ceiling detail, or revising structural components can affect framing, electrical, plumbing, drywall, and finish work.
When these revisions change the work included in the original agreement, a change order documents the associated adjustments.

3. Unforeseen Existing Conditions
Renovation projects can involve conditions that are not visible until demolition or construction begins.
Examples include:
Concealed water damage or deteriorated framing.
Plumbing or electrical installations that differ from the available drawings.
Structural deficiencies discovered after opening walls.
Hidden conditions requiring additional corrective work.
These conditions do not automatically mean additional charges. We first evaluate whether the required work is already covered by the construction agreement, an allowance, or another applicable contractual provision.
If additional work falls outside the agreed scope, a change order may be required.
4. Building Code or Inspection Requirements
During permitting or construction, an inspector, engineer, or building department may identify work that requires modification.
Whether this results in a change order depends on the original contract, the approved plans, and the reason for the additional requirement.
Our responsibility is to explain the issue, determine the appropriate solution, and identify any legitimate impact on cost or schedule before proceeding.
5. Allowance and Material Selection Adjustments
Some construction agreements include allowances for materials or products that have not yet been finalized.
For example, a contract may include a specified allowance for plumbing fixtures, tile, or appliances.
If the final approved selection exceeds the allowance, the difference may require a documented adjustment. If the selection is below the allowance, the applicable credit should be addressed in accordance with the contract.
The important distinction is that an allowance adjustment is not necessarily additional construction scope. It is a reconciliation of the amount originally carried in the contract against the final selection.
How Does the Change Order Process Work?
At Stepbrothers Contracting Group, our goal is to make the process transparent and straightforward.
Step 1: Identify the proposed change
A change may originate from the homeowner, architect, designer, construction team, or an unforeseen field condition.
We first establish what is being requested or what condition needs to be addressed.
Step 2: Evaluate the scope and impact
We review the proposed change to determine what additional work, materials, subcontractors, or coordination may be required.
We also evaluate whether the change affects previously completed work, material orders, or the construction schedule.
Step 3: Prepare the change order
When a formal change order is necessary, we document the proposed modification, including:
A description of the work being added, removed, or revised.
The associated cost or credit.
Any applicable schedule impact.
Other relevant conditions or requirements.
Step 4: Review and obtain approval
The change order is presented to the homeowner for review and written approval.
Clients have an opportunity to ask questions and understand the proposed adjustment before authorizing the work.
Step 5: Incorporate the approved change into the project
Once the required approval is received, we coordinate the revised scope with the appropriate trades and update the project documentation, budget, and schedule as applicable.
Our standard process is to obtain written authorization before proceeding with change-order work, subject to any emergency provisions or other requirements in the construction agreement.
How Can a Change Order Affect the Construction Schedule?
A common misconception is that a change order affects only the cost of construction.
In reality, changes can affect the schedule even when the associated cost is relatively small.
For example, relocating a plumbing fixture may require additional plumbing work, inspections, drywall repairs, and coordination with tile installation.
Similarly, changing a custom cabinet configuration after fabrication has begun may require revised drawings, new materials, and additional production time.
We evaluate schedule implications as part of the change-order process, although some impacts may not be fully known until material availability or subcontractor commitments are confirmed.
This is one reason we encourage homeowners to make selections and design decisions as early as possible.

Does Every Change Order Increase the Cost?
No. A change order can result in an increase, a decrease, or no change to the contract price.
For example:
Adding work may increase the contract amount.
Removing work may result in a credit, subject to any costs already incurred or contractual conditions.
Substituting one material for another may result in a price adjustment in either direction.
A modification may affect the schedule without changing the price.
The purpose of the change order is not simply to document additional charges. It is to accurately record the agreed-upon modification.
What About Verbal Requests or Conversations on the Jobsite?
We encourage open communication throughout construction. However, conversations with a superintendent, subcontractor, or other team member should not be interpreted as authorization to modify the contracted scope.
A verbal discussion may initiate a request, but the change must be evaluated and documented through the appropriate approval process.
This protects everyone involved and helps prevent misunderstandings about cost, timing, and expectations.
For the same reason, homeowners should avoid directing subcontractors to perform additional work outside the established process.
Can Change Orders Be Avoided?
Not every change can be anticipated, particularly during extensive renovations. However, thoughtful planning can significantly reduce unnecessary changes.
The most effective approach is to finalize as many decisions as possible before construction begins.
That includes reviewing architectural plans carefully, confirming material selections, understanding allowances, coordinating design details, and identifying specialty products with longer lead times.
We also encourage homeowners to consider how a proposed change may affect the broader project, rather than evaluating the modification in isolation.
A well-organized preconstruction process is one of the best ways to protect both the construction budget and schedule.
Our Commitment to Transparency
At Stepbrothers Contracting Group, we recognize that building or renovating a home represents a significant investment.
Our responsibility is to provide clear information, communicate changes promptly, and help homeowners make informed decisions throughout the construction process.
Change orders are an important part of that responsibility. When handled properly, they provide a documented, transparent process for adjusting the project while maintaining alignment between the homeowner, design team, and construction team.
The goal is simple: No surprises, clear expectations, and informed decisions at every stage of construction.